Two Outdoor heaters to be connected. 30 mins north of Waiuku. Black flex required for final part of the connection along the raft to the heater on the wall. Heater are Kelway 1 x I-30 & 1 x I-40 both with controllers. Just need installed on a labour and materials basis.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 11-10-2021
Partner with Builderscrack
Get work