We have 2 new sleep outs which came with the lights and power wired to a switch board and the switchboard is wired to a out door caravan plug on each cabin The cabins are 20 metre away from the main house We require 2 outdoor plugs installed on the main house and 2 caravan leads provided from the house to the cabins
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
85 jobs | No longer in contact |
#3 | Tradie 3 |
|
43 jobs | No longer in contact |
#4 | Tradie 4 |
|
15 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
3 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 46 jobs | No longer in contact |
Partner with Builderscrack
Get work