Active job

Run cables to 2x new sleep out

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Switchboards
Franklin

We have 2 new sleep outs which came with the lights and power wired to a switch board and the switchboard is wired to a out door caravan plug on each cabin The cabins are 20 metre away from the main house We require 2 outdoor plugs installed on the main house and 2 caravan leads provided from the house to the cabins


Trade professionals

#1 Tradie 1
8 jobs No longer in contact
#2 Tradie 2
85 jobs No longer in contact
#3 Tradie 3
43 jobs No longer in contact
#4 Tradie 4
15 jobs No longer in contact
#5 Tradie 5 Not reviewed 0 jobs No longer in contact
#6 Tradie 6 No recent reviews 0 jobs No longer in contact
#7 Tradie 7
3 jobs No longer in contact
#8 Tradie 8 No recent reviews 46 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo