This job is a new building. The power cables are already installed in the shed from a main power source. I would like about 9 power points 3 are double power points, 8 ceiling lights, 2 security lights, 2 ceiling fans installed (I have the fans on hand), extractor fan in bathroom, hot water cylinder installed (I have the hot water cylinder) and an insinkerator power point and switch (I have the insinkerator). I think I have covered it all but if someone is prepared to come out and give me a quote onsite or quote me online I look forward to your replies on this job.
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work