The ducting and vents have been fitted in all the rooms; all that is required is for an electrical socket to be installed in the roof space and the thermostat fitted into the wall.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
A very straightforward transaction. Excellent communication and workmanship. I would definitely use him again.
Work carried out by the owner/operator
Reviewed on 22-08-2021
Partner with Builderscrack
Get work