Adjoining basement garage has been wired with a new switchboard (purchased prewired with a COC supplied), 6 x 10A double powerpoints, 6 x fluorescent lights (these were previously installed but have been connected to the new switchboard) and 1 x 15A outdoor double powerpoint on the exterior wall. A 6mm cable has been run from this garage switchboard back to the main switchboard in the house but has been left disconnected behind the board. Work required is the connection of this submain cable at the main switchboard and any required testing or certification to make it legal. A free MCB is available on the main switchboard too, it just needs connected.