Review

Kitchen and single toilet renovation electrical work

Job image
Job image

Job description

General Electrical
Christchurch

We are in the midst of renovating our kitchen and single toilet so this will most likely 2 or 3 visits. The first visit we are hoping for this Friday or Saturday (19/3 or 20/3) if possible. Currently have a few walls open. First visit we want to get the new inline extractor fan and light installed for the single internal toilet, we will provide the extractor fan ( --- / --- ) and light fitting but don't have a switch or run on timer. We are hoping we can have it so the light and fan come on using the same switch and then the light turns off but the fan continues for a few minutes when turned off (if this is possible to do?). We will have the hole cut for the extractor fan but would like the rest of it installed. Plus also any wiring for the next visits if needed while the toilet walls are open. After the first visit we will have these things to do but not 100% on when or what but is more given now incase you need to run wires while the walls for the toilet are open as it backs onto the wall with the switch board. -Hot water cylinder rewiring in new location -Oven rewiring in new location (the oven and hot water cylinder are almost exactly swapping places) -New led downlights install with switches being moved -Moving power points for new kitchen -Moving outdoor light -Installing switch in the roof for new rangehood Potentially more will be added in the future but really hoping to get the ball rolling with the first visit. At the moment wanting to get the pricing for the first visit only cheers.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo