Hardware supplied, wiring already in place as replacing like for like as follows: Install new heated towel rail. Install new wall mounted light fixture. Replace current ceiling light unit (type that has extractor and heat lamps) with new one, the venting is already in place. Reaffix hot point above vanity. Change current light switch from 5 switches to 4 as we no longer require wall mounted heater (switch will need to be supplied by trades person).
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Arrived on time, clear communication, cleaned up after themselves even though I said they didn't need to (we're mid reno, the place is a pigsty anyway!) and kept to the quote. Couldn't have asked for more! Thank you
Work carried out by the owner/operator
Reviewed on 24-01-2020
Tradesperson reply
"Thanks for your kind words. You were great to work with also. Enjoy your new bathroom. Cheers KJ"
Partner with Builderscrack
Get work