Require a new updated fuse/meter board along with a new main to the outside connection. House was built in 1932. Easy access to both ends via attic. Need quote with labour and parts separated. This is a first stage and there is other work to be carried out at a later date as eventually the complete house will be rewired. Would like this initial work to be carried out in late August/early Sept.
#1 | Tradie 1 | No recent reviews | 25 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 64 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
199 jobs | No longer in contact |
#5 | Tradie 5 |
|
38 jobs | No longer in contact |
#6 | Tradie 6 |
|
74 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 10 jobs | No longer in contact |
Partner with Builderscrack
Get work