Published on 11th March 2026
1976 one bedroom flat.
Check grounding and most likely install grounding stake and ground the flat electrical system - previously grounded to steep piping which was disconnected a while ago.
Secure dangling wiring from house to garage and add sockets to garage.
Repair a faulty socket + possibly install a few new throw-out the flat .
Expect required end of March / beginning of April, ideally before insulating.
| Quality of work |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Thank you Corey, great work and much appreciated."
Work carried out by the owner/operator
Review posted by Philip on 1st May 2026
Verified work review
Partner with Builderscrack
Get work