Review

bathroom reno

Job image
Job image

Job description

Electrical Renovations
Auckland

Hi - I have a bathroom renovation I need the following done - Current situation - there is an existing above mirror light and heated towel rail. Electrician will need to isolate, disconnect and remove these prior to the bathroom demo (11th April required). We have purchased a new over mirror light and a new towel rail in the same position. These will need to be fitted after tiling work has been done. Approx. Monday 6th May. The only new wiring will be an extendable mirror which will need to be fitted. I have attached photos of the existing bathroom, everything remains in the same spot and I have shown the placement of the new extendable mirror (red circle). Please quote for this. Meadowbank location. Timing of fitting removal and isolation - Thursday 11th April approx. Timing of new fittings to install - Monday 6th May approx.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great communication, friendly service and good pricing, will definitely use again.

Work carried out by the owner/operator
Reviewed on 13-05-2019

Tradesperson reply
"Thanks for the great review Lucy! Much appreciated!"

Verified Builderscrack review

Trade professionals

#1 Tradie 1
267 jobs Secured job
#2 Tradie 2 No recent reviews 9 jobs No longer in contact
#3 Tradie 3 No recent reviews 3 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact
#5 Tradie 5 No recent reviews 42 jobs No longer in contact
#6 Tradie 6 Not reviewed 0 jobs No longer in contact
#7 Tradie 7
140 jobs No longer in contact
#8 Tradie 8
136 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo