Complete replacement and repair of ally sliding door wall which fell out during the storm. The front of the Unit is on ghe ground floor but the balcony job elevates on a second floor height (3.5m) with a narrow overhanging deck.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 4 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work