Supply, install and paint sliding entry kitchen door Supply, install and paint double hung double opening doors to above counter top in kitchen. Supply and install mirrored cabinet to above bathroom vanity. Supply and install and paint outdoor cupboard to carport - plywood with floor, double doors, shelves, locks and handles. In the 2-6 weeks would be great.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Laurence is a tradesman, he has all the gear to do the jobs correctly and speedily. Recommend him highly.
Work carried out by the owner/operator
Reviewed on 07-12-2021
Partner with Builderscrack
Get work