Hi, I need labourers to remove: 1. Approximately 1 cube of concrete rubble up a 60 meter path and into a skip bin on road side. 2. Plus, approximately 1 cube of old gravel / base course / soil ( beside concrete in photo) up path & steps, dump in garden (about 10 meters up path). The zig zag path has a few steps scattered up it. There is wheel barrow , shovels and timber blanks on site if required. I estimate this would take a couple fit people approx 2-4 hours? Thanks
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 |
|
42 jobs | No longer in contact |
Partner with Builderscrack
Get work