Front of site needs to be cleared Need existing concrete removed (130ish sqm), and Grass scraped off (200ish sqm). Additionally some tree trunks removed. In between removal loads, pick up base metal and put down.
#1 | Tradie 1 |
|
6 jobs | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
#3 | Tradie 3 |
|
48 jobs | No longer in contact |
#4 | Tradie 4 |
|
256 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
#6 | Tradie 6 |
|
33 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 24 jobs | No longer in contact |
#8 | Tradie 8 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work