The removal of 8metres by 5 blocks high of concrete block wall and removal of debris from a commercial property. Note this is a demolition of part of the wall.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 16-10-2019
#1 | Tradie 1 | No recent reviews | 8 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 3 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
#4 | Tradie 4 |
|
6 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 78 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 1 job | No longer in contact |
#7 | Tradie 7 |
|
36 jobs | No longer in contact |
Partner with Builderscrack
Get work