3 strips of concrete already cut. Each strip is 1.6 m x 220 mm x 100 mm. Concrete needs to be broken into manageable pieces. NO need for the concrete to be removed if job completed by 12 September 2018. Confined space will allow a jack hammer to be used but difficult to swing a sledge hammer.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Satisfied with the work and happy to have requirement met within the time frame
Work carried out by the owner/operator
Reviewed on 14-09-2018