Kwila deck demolition required in Northcote. The deck is approx 45-50sqm and 30 years old. It sits low to the existing ground so access/work is straightforward. I have removed the 90x20mm Kwila planks from a third of it already, need someone to; - Transfer dirt from existing deck-mounted planter to an existing garden bed on property via wheelbarrow. The size of planter is about 1.5x1.5 and 300-400mm high. (refer photos) - Strip remaining decking planks and dispose of. - Remove and dispose of all existing joists. The bearers and posts are to remain. Joists are at 450mm centres to give you a sense of how many there are. I will spray paint everything to be removed so the extent of works is clear on the day Hoping to have this work completed ASAP so i can start new decking work.
#1 | Tradie 1 |
|
165 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
532 jobs | No longer in contact |
#4 | Tradie 4 |
|
3 jobs | No longer in contact |
#5 | Tradie 5 |
|
26 jobs | No longer in contact |
#6 | Tradie 6 |
|
42 jobs | No longer in contact |
Partner with Builderscrack
Get work