Job description

Site Clearing
Kapiti Coast

Bunk-house (ex-railway hut) to be demolished and removed from site. Site to be levelled in preparation for a replacement building. Single story, 2.5m x 4m, wooden construction with weatherboard exterior and corrugated iron roof. No asbestos to our knowledge. Electricity connection (will be disconnected before demolition), but no plumbing. Foundations look like piles/posts, single concrete step at entrance. Building is in poor condition: roof has rusted through and partially collapsed ceiling + floor on one side, rot and/or borer in wooden posts. Pictures attached. Building is located between boundary fence and batch with approx. 1.5 m clearance on either side, however fully accessible from back of property. Flat access down drive to the side of the batch (enough clearance for tanker access). See also our other job listing: Asbestos cement clad outbuilding removal


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Dan's good value. Called to discuss job before sending quote. Came over before starting the job to disconnect power to building + go over the job. Arranged the time/day to suit our schedule. Showed up promptly when he said he would and stayed until the job was done -though it took nearly 10 hours, he could have come back and charged extra but didn't. Even took a couple of loads of green waste + rubbish we had from clearing the section to the tip. Buildings gone with no unexpected costs.

Work carried out by the owner/operator
Reviewed on 02-03-2022

Tradesperson reply
"Phillipa was needing a lot done and with her help we managed to plan a day that got her main demolition job done and the general section tidy up as well. Phillipa is easy to work for and I had another enjoyable job. Dan"