Review

Garage Demolition Court Cres Panmure

Job description

Site Clearing
Auckland

Demolition and removal of old garage built circa 1945. approx 6m x 6m. walls old cinder blocks and scoria rocks plastered over. Roof timber frame with corrugated concrete with asbestos. Floor partial concrete and earth. Will require block wall attached to house to be cut. Timeframes: flexible but complete before end October ideal.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Very easy to work with

Work carried out by the owner & subcontractors
Reviewed on 08-08-2021

Verified Builderscrack review

Trade professionals

#1 Tradie 1
6 jobs Secured job
#2 Tradie 2
26 jobs No longer in contact
#3 Tradie 3
19 jobs No longer in contact
#4 Tradie 4
130 jobs No longer in contact
#5 Tradie 5
11 jobs No longer in contact
#6 Tradie 6
20 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo