old carport slab needs to be cut from main slab broken up and rubble removed. Easy access and possible to bring bin in for a day or two for the work. pad looks to be 75-100mm thick. Looking for a quote, time and avaliablity.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mike was a great tradesman, very professional and did a tidy job - would certainly recommend.
Work carried out by the owner/operator
Reviewed on 11-08-2019
Partner with Builderscrack
Get work