We are looking to have a 4m by 4m concrete pad put in our bottom yard to put a temp pool (8k litres) on over summer months. The ground falls away a little, so will need to be levelled first.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
27 jobs | No longer in contact |
Partner with Builderscrack
Get work