Hi we have a pole shed floor that is nearly ready to have concrete floor put in 72m2 at 150mm thick with polythene and mesh. Needs to bea decent finish inside for machinery. Once the shed floor is poured we will be replacing all of our exsisting driveway which is a combination of cobbles and the old two concrete strip drive. We will probably have someone who will take the cobbles so will be some excavation and tidy up after and obviously removing the exsisting strip driveway. The cobbled area up to shed is 180m2 and the driveway is another 90m2 There will also be another area of driveway which is new that is another 150m2 but this will be defendant on the total cost of exsisting driveway Obviously with such a large amount of concrete we need a very sharp price. We are happy to do the whole job at once or break it up into smaller jobs whatever is going to work out the best
#1 | Tradie 1 |
|
27 jobs | Secured job |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
Partner with Builderscrack
Get work