A 45 metre path (width 900mm) needs concreting, preferably in the next three weeks. It consists of four main sections and zig-zags down a slope. The boxing will already be done, as will most of the levelling. The job involves laying concrete to a depth of 80mm, with fibre mesh, followed by expansion joint cutting a week later. There is reasonably good access allowing the piping of concrete down from a mixer in the street.