We are seeking to repave our shared driveway. The driveway falls steeply from the street then flattens. The section we want to repave with concrete is 62.5m long and would require 210 square metres of concrete. The photos below may give some idea of the work. The first photo looks down the driveway from the top. The second photo is from the flattish section looking up to the top and the third photo is looking up from the lowest point that the new work will cover.
#1 | Tradie 1 |
|
44 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
33 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 3 jobs | No longer in contact |
#5 | Tradie 5 |
|
279 jobs | No longer in contact |
Partner with Builderscrack
Get work