3 cubic metres already boxed ready to go pad gently sloping down to pathway under a deck needs to ramp up to door and level on to path some finishing around timber retaining posts can be covered from above so could be poured in the rain
#1 | Tradie 1 |
|
27 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 15 jobs | No longer in contact |
Partner with Builderscrack
Get work