I've got a garage floor going down at the end of the month in Woodville.one area 48m2.. 9.5m x 5m..as well as a 15m2 area 5m x 3m ( small existing shed with a gravel floor). The trucks turning up with 10m3 of concrete. Base course will be down,reinforcing in place, poles will be braced in position and the site will be boxed off. I will need the basecourse compressed. Get back to me if you wanna spread it for me. Thanks Nigel
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work