- New driveway to new build. Currently in foundation stage but need estimate for budgeting purposes. The earlier we secure a tradie, the better - Driveway to be at least 100mm thick. Total area = 100m2 - Asphalt to vehicle crossing 40mm thick. Total area = 32m2 - Pathway to be at least 75mm thick. Total area = 30.07m2 - Patios to be at least 75mm thick. Total area = 26.7m2 - Miscellaneous concreted areas to be at least 75mm thick. Total area = 1.44m2 - Cost for standard concrete to all areas - Cost for coloured concrete to all areas - Cost for exposed aggregate to driveway and walkway only