Need driveway excavated and boxed then sort out concrete and follow through with the laying and final work. There is a time frame in that we would like the job done before winter arrives. The area is a rather large area with a couple of trickish bits to add to the challenge. Driveway would need to be constructed to accept up to three ton truck. The driveway would also need to be cut as is usual practice for large concrete areas. The site has easy access. All excavated material would need to be removed from site.
Partner with Builderscrack
Get work