Ground surface graded and leveled. Boxing and re-bar placed down. Concrete poured, leveled and sloped away from the building. Cobblestone laid, for access to utility services below ground.
#1 | Tradie 1 |
|
27 jobs | No longer in contact |
#2 | Tradie 2 |
|
12 jobs | No longer in contact |
#3 | Tradie 3 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work