Require a quote to Uplift existing cracked concrete which is 5.3m w x3.7m L And pour a new concrete slab. Will require the new slab to be a extra 2.7 m longer in Length as will replace existing garden area which is clear Concrete has broken and uplift around manhole cover over the years. Can be started immediately or when suits tradie would like to be completed by March time
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
58 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 12 jobs | No longer in contact |
#4 | Tradie 4 |
|
155 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 2 jobs | No longer in contact |
#6 | Tradie 6 |
|
16 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work