The rounded corners of 3 concrete arches to be removed so they can be square shape. The photos show the existing round arches with orange garage doors. The second photo shows the square garage entrances which is what we want it to look like. Job to start from 15 July. Access to the property for quoting is on 27 June at 9am.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
3.0
|
Communications |
4.0
|
Concrete arches removed and replastered. And interior solid plastering. Job took longer than originally advised however we think this may have been because job was a bit bigger than was expected. Turned up everyday and worked hard to complete to a good standard which is very important. Would use them again.
Work carried out by the owner/operator
Reviewed on 01-08-2019