New Zealand is at Alert Level 4. Only emergency works can be carried out on property during this time. Tradies and Homeowners can still communicate to discuss quotes and information for future jobs, as long as this is in-line with the current restrictions. More information available here.

Post job.
Choose tradie.
Easy.

With thousands of tradies across NZ, Builderscrack has your job covered

Cut a concrete channel for RainWater into existing drain

Job description

closed
Posted 1 year ago

Water seeps below our Garage door on heavy rain. A new Drain channel needs to be created, length about 8m to allow water connect to existing drain.
It will involve cutting a groove in existing asphalt and creating a drain. Alternately create a channel with cement. as in photos
Sample cutting shows the concrete does not have iron bars and so easy to cut with a smaller concrete cutter.

Tradespeople

Tradie #1 10 jobs Secured job
Tradie #2 85 jobs No longer in contact
Tradie #3 not reviewed 0 jobs No longer in contact
Tradie #4 20 jobs No longer in contact

Review for this job

Workmanship
 5
Cost
 4
Schedule
 4
Communication
 5
Get started now! Post your job for free and find the right tradie. Post your job for free, now!