Introduce a roughly 10 to 20m concrete pavement to reach the gas tong for the gas delivery man. Concrete roughly 20mx1.5m area at the back of the sleepout to prevent flooding
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
112 jobs | No longer in contact |
Partner with Builderscrack
Get work