Timer and post retaining to a maximum of 1.5m. Retained side changes twice along the 40m length. Also 2 x 3m long by 1.2m high engineered keystone retaining walls. Followed by formation of driveway. Most of the work on a gentle slop. keystone walls at the bottom a bit difficult
#1 | Tradie 1 |
|
58 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 44 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 19 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 17 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 1 job | No longer in contact |
#8 | Tradie 8 | No recent reviews | 174 jobs | No longer in contact |
Partner with Builderscrack
Get work