Published on 9th July 2025
Two disabled bathrooms have the shower drains raised higher than the floor so the water does not drain. I am meeting with hard plasterers to quote but, also need to alternatively look at options to grind the floor down then reset the floor drains. The vinyl layer will then lay over the top of the finished work.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Really good experience I will use Cuizon Construction for future work at multiple sites."
Work carried out by the owner/operator
Review posted by Jason on 30th July 2025
"Thank you very much...I really appreciate this comment and reviews.."