I have a concrete pad that needs to be removed and disposed of. The dimensions are 7m x 5 m and it is 150mm thick. A concrete nib and path also need to be taken up. Whilst the digger is onsite I am hoping that a couple of concrete fence posts are able to be removed. Timing - within 4-5 weeks at this stage.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
20 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work