Looking at the removal of an area of 5m length by 5m widith of Asphalt and replacing with concrete or another suitable material under an existing carport area. Also require a soultion for updated drainage as current carport area is prone to flooding during major rains.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work