We need a clothesline area and are wanting a concrete slab poured in a area that is approximately 4m x 3m. Obviously some prep work is required. The job must also include putting in the clothesline. Sooner rather than later would be great.
#1 | Tradie 1 |
|
121 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
Partner with Builderscrack
Get work