3 separate straight (no curves) concrete paths around one new building: 4080 x --- x --- x 900 (all mm). Plus one little connecting bit which I can't measure exactly yet, in total would be a little less than 1m2 I think. I presume you do your own digging to prepare the site; if this is the case, would you also be able to do the digging preparation for a paving job on the same site (approximately 20m2)? IN all cases the paths (and paving) are being done on soil area, i.e. no old concrete to break up and remove.
#1 | Tradie 1 | No recent reviews | 24 jobs | No longer in contact |
#2 | Tradie 2 |
|
68 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 17 jobs | No longer in contact |
#5 | Tradie 5 |
|
41 jobs | No longer in contact |
#6 | Tradie 6 |
|
154 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 24 jobs | No longer in contact |
#8 | Tradie 8 |
|
45 jobs | No longer in contact |
Partner with Builderscrack
Get work