We're going to have 2x sump holes cut through the pad of our warehouse on Monday 22nd July that we'll need to have lined with concrete. These will act as low points for draining two bunded areas inside our warehouse. We need this job to start on Tuesday 23rd, with completion on Wednesday 24th. Sumps will likely be ~0.5m cube with 100mm thick floor and sides; will post a drawing shortly.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Thanks guys, concrete sumps are doing the trick nicely!
Work carried out by the owner/operator
Reviewed on 05-08-2019
#1 | Tradie 1 | No recent reviews | 20 jobs | Secured job |
#2 | Tradie 2 |
|
11 jobs | No longer in contact |
#3 | Tradie 3 |
|
121 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 19 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 174 jobs | No longer in contact |
Partner with Builderscrack
Get work