We have an exposed aggregate drive and pathway. We need one section of curved pathway removed and replaced with a larger (approx 13m2) section to make extra off street parking.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Milli was the first one to reply to our job request, came out the same day to measure and quote, told us exactly when he'd be here, and kept to the time. He had to match the exposed aggregate as closely as possible to the existing driveway which is 13 years old, and it looks amazing. Would definitely use him again.
Work carried out by the owner/operator
Reviewed on 16-07-2016
Partner with Builderscrack
Get work