Published on 16th February 2025
This job was completed under emergency circumstances without obtaining a prior quotation. I am now requesting two formal quotations for the following scope of work:
Scope of Work:
• Reinforcing drilling of starters into the existing concrete.
• Cutting the driveway and trenching for 12.5 meters (concrete thickness: 200–300 mm; trench de --- –700 mm).
• Addressing recurring cracks and recutting edges.
• Breaking out the trench using a digger and breaker.
• An additional two meters of trenching in the garden near the boundary (no concrete cutting required, but soil removal to expose the main power feed).
• Hydro vac services to expose existing power and water lines at $240 per hour plus tipping costs.
• Backfilling, including allowances for digger, labour, and truck use.
• Concrete costs for a ready-mix truck, including a small load charge of $504.00.
Attached is a quotation of $16,754.12 + GST for this project. Is this excessive? I am seeking two formal quotations from experts. A token of appreciation will be provided as thanks.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Thank you and happy with the meeting"
Review posted by Lisa on 30th March 2025
Verified communication review
Partner with Builderscrack
Get work