This has been measured by two companies at 143 then 170 m2!! The driveway is steep and has been compacted and shaped so will nee some minor shaping before putting the exposed ag on. Drainage is already in place with a single trap in front of the garage. Contractor can stay in the holiday home during the period of the job. Photo of driveway is attached.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work