Active job

Driveway strip replacements

Job image
Job image
Job image

Job description

Concrete Driveways & Paths
Hastings

Tree root ground subsidence has cracked the old drive strip at my rental so best both strips are replaced. Am guessing the time taken to box 2 strips you may discuss doing the grass strip inbetween with concrete too. Let's see. Length is approx 1 and a half cars by double wheel width? So say 5m x .6m. Should be cracked in a day removal and pour..? with curing OK in this weather a few days later?


Trade professionals

#1 Tradie 1
7 jobs No longer in contact
#2 Tradie 2
4 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo