We have a section of lawn that we would like removed and replaced with a concrete pad to extend the usable dice off the side of our deck. Area is 3m x 4.4m. We would require you to please:- Dig out to required depth and take the dirt away. Box up (leaving a 10cm gap along fence side so we can put some stones in it ourselves to assist with drainage. Supply and pour concrete. Level and finish as required. Area is as per the photo below and is the grass area along to the column that aligns with end of the deck.
#1 | Tradie 1 |
|
130 jobs | No longer in contact |
#2 | Tradie 2 |
|
15 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 12 jobs | No longer in contact |
Partner with Builderscrack
Get work