7.2 x 6mtr concrete slab floor- 225mm with a 150mm above ground requirement with min 100mm in centre. Most include polyethene moisture layer. Slab for Steel garage. We can supply concrete as already have a contact through son's work. Need boxing, mesh and pour and finishing management. Will require council inspection. Job site in Wattle Bay, Awhitu. Earthworks commencing 18 Sept 2020 and will be ready for boxing and pour by 23 September 2020