We have a newly built house that has some concrete pathways. We want to replace a bit of the area that is grasses with concrete to extend the concrete areas. 1 section is approx 3m x 2m, and a 2nd section at approx 7m x 1.3m. The attached photos are from when the pathway was laid. The sections with the yellow squiggles in them are the areas we do now want to concrete. Dirt will have to be removed, boxed up and then concrete laid.
#1 | Tradie 1 |
|
106 jobs | Secured job |
#2 | Tradie 2 |
|
121 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 15 jobs | No longer in contact |
Partner with Builderscrack
Get work