Our gravel driveway (approx. 40m in length by 3.5m) needs to re-gravelled. My vision is 5 - 7mm of AP 20/40 and then a thin layer of clean gravel over the top. You'll need to be in a position to organise these materials either picking up yourself or having them dropped off. From there some manual labour with wheelbarrowing, dumping and spreading out as required for a clean finish. Levelling doesn't need to be exact but suitable for purpose of use. I'm happy to take advise around materials and process,. Of importance, however, is the width of the driveway and that it there is a boundary fence on the side. Though there is turning space at the top access would be best suited to reversing up and trucks carting materials no bigger than 5 tonne. You'll need to be a confident driver. I'd like done before xmas.
#1 | Tradie 1 | No recent reviews | 18 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work