Published on 26th August 2025
A concrete slab of +- 5.5 - 2.2 m to put a hot pool on. It probably needs to be enforced and needs drainage as it against a garage wall. Most of the excavation has been done manually. There is just an old 2m concrete beam that possibly needs to be removed.
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"Matt is very easy to work with. Good communication, timely execution, quality work and reasonable price. Highly recommanded"
Work carried out by the owner/operator
Review posted by Hans on 16th September 2025
Verified Builderscrack review
Partner with Builderscrack
Get work