1) Concrete planter trough front of Sleep-out after plants were removed (approx 4 - 5 m length) exposing a PVC pipe running across. 2) Concrete/repair broken cemented pathway by side of Sleep-out. 3) Replace a small concrete slab at end of cemented pathway with bigger slab to safely cover power lines beneath the earth. 4) Prop up small area of sliding earthwork after the sewer pipes job.
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
#2 | Tradie 2 |
|
104 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 9 jobs | No longer in contact |
#4 | Tradie 4 |
|
15 jobs | No longer in contact |
#5 | Tradie 5 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work